Spring has sprung and maintenance of slip sites through landcare work has begun. This allows access to the small trial sites of Vetiver and some quick photos.

Site 1 is based in North Maleny on Bridge Creek and is a large landslip site that has continuing debris slides due to heavy rainfall and spring activity pushing on the soil. The hedges were cut and larger weeds were removed inside of the trial area. A majority of the Vetiver plants are still growing in the mud and performing slower than the top rows in the better/drier conditions.

Update to slip site 1

Update to slip site 1

Update to slip site 1

Site 2 is also based on Bridge Creek in North Maleny but is lower down in the catchment and is positioned inside of a large historical landslip with spring pressure on the other side of a road cut. The Vetiver here will hopefully prevent loss of the road and is part of a large rainforest planting to help stabilise other areas of the site.

Update to slip site 2

Update to slip site 2

Update to slip site 2

Site 2 has also started to catch collapsing soil which is often overlooked in native plantings as it takes a significant amount of time, sometimes years, to begin to hold and arrest soil movement. Vetiver has started in months and it will only improve.

Update to slip site 2

Update to slip site 2

Anecdotally, for a poor planting location, the Vetiver and a Hoop Pine are performing well together giving hope for Vetiver as a tool to save soil in revegetation projects based around native plants.